Changing Values on Edit

Labels
AJAX(112) App Studio(8) Apple(1) Application Builder(245) Application Factory(207) ASP.NET(95) ASP.NET 3.5(45) ASP.NET Code Generator(72) ASP.NET Membership(28) Azure(18) Barcode(2) Barcodes(3) BLOB(18) Business Rules(1) Business Rules/Logic(140) BYOD(13) Caching(2) Calendar(5) Charts(29) Cloud(14) Cloud On Time(2) Cloud On Time for Windows 7(2) Code Generator(54) Collaboration(11) command line(1) Conflict Detection(1) Content Management System(12) COT Tools for Excel(26) CRUD(1) Custom Actions(1) Data Aquarium Framework(122) Data Sheet(9) Data Sources(22) Database Lookups(50) Deployment(22) Designer(177) Device(1) DotNetNuke(12) EASE(20) Email(6) Features(101) Firebird(1) Form Builder(14) Globalization and Localization(6) How To(1) Hypermedia(2) Inline Editing(1) Installation(5) JavaScript(20) Kiosk(1) Low Code(3) Mac(1) Many-To-Many(4) Maps(6) Master/Detail(36) Microservices(4) Mobile(63) Mode Builder(3) Model Builder(3) MySQL(10) Native Apps(5) News(18) OAuth(9) OAuth Scopes(1) OAuth2(13) Offline(20) Offline Apps(4) Offline Sync(5) Oracle(11) PKCE(2) Postgre SQL(1) PostgreSQL(2) PWA(2) QR codes(2) Rapid Application Development(5) Reading Pane(2) Release Notes(184) Reports(48) REST(29) RESTful(29) RESTful Workshop(15) RFID tags(1) SaaS(7) Security(81) SharePoint(12) SPA(6) SQL Anywhere(3) SQL Server(26) SSO(1) Stored Procedure(4) Teamwork(15) Tips and Tricks(87) Tools for Excel(2) Touch UI(93) Transactions(5) Tutorials(183) Universal Windows Platform(3) User Interface(338) Video Tutorial(37) Web 2.0(100) Web App Generator(101) Web Application Generator(607) Web Form Builder(40) Web.Config(9) Workflow(28)
Archive
Blog
Sunday, December 30, 2012PrintSubscribe
Changing Values on Edit

Client-side business rules allow changing the value of a field without having to save it to the database. This way, the user can either approve the value, change it, or leave the original data intact.

Let’s add 7 days to the Order Date of an order when a user starts editing.

Start the Project Designer. In the Project Explorer, switch to the Controllers tab. Right-click on Orders / Business Rules node, and press New Business Rule.

Creating a new business rule for Orders controller.

Assign the following values:

Property Value
Type JavaScript
Command Name Edit
Phase After
Script
var d = [OrderDate];
if (this.dataView().get_isEditing() && d != null) {
    d.setDate(d.getUTCDate() + 7);
    d.setHours(0);
    [OrderDate] = d;
}

The business rule will get the current date value of OrderDate, add 7 days, and assign the value.

Press OK to save. On the toolbar, press Browse. Navigate to the Orders page. Note the Order Date of a specific record.

Highlighting an order record and noting the Order Date.

Start editing the the record. The Order Date will be moved forward by 7 days from the original value.

When the order is edited, the Order Date is moved forward by 7 days.

If the user presses Cancel at this time, the Order Date will not be changed. If the user saves the record, the new value will be applied.

Order record with new order date.